Construction of the 24-inch gas pipline from the Dashtak junction to Zabol.

In the field of Oil and gas

Place of execution:

Sistan and Baluchestan Province - Zabol

Implementation time:

Concluded

Contract amount:

Project Manager:

Engineer Nematollah Rouin

Construction of a 100 km route involving 1,200,000 cubic meters of earthworks; construction of a 110 km canal involving 215,089 cubic meters of earthworks; mechanical works for a 110 km, 24-inch gas pipeline; construction of the Zabol pressure reduction station; installation of fiber-optic cabling along the route; construction and installation of a 30 km power transmission network; supply and installation of 3,100 square meters of precast walling (3 meters in height).

Specifications:

  • Employer:

    National Iranian Gas Company

  • Consultant:

    C Sakht Consulting Engineers