Construction of a 19-kilometer-long, 7.5-meter-wide access road; preparation of the camp site and exploration well area (cellar); and construction of 22 bridges—comprising both cast-in-place concrete and pipe culvert types with multiple spans—along with the installation of causeways (fords) along the route.